Blog Archives

ARNSIDE BRIDGE, CUMBRIA

Works completed on behalf of Mabey Bridge LTD at the Chepstow premises.

Comments Off on ARNSIDE BRIDGE, CUMBRIA

GREENFORD FOOTBRIDGE, A40, WEST LONDON

Total deck refurbishment, in conjunction with Roadtechs for TFL.

Comments Off on GREENFORD FOOTBRIDGE, A40, WEST LONDON

BASCULE ROAD BRIDGE, LONDON

Project completed on behalf of RoadTechs Europe for the TFL.

Comments Off on BASCULE ROAD BRIDGE, LONDON

STENA LINKSPAN, FISHGUARD

The application of the Bimagrip system, in between tides and ships schedule, for Stenline during October 2011.

Comments Off on STENA LINKSPAN, FISHGUARD

PORT OF DUBLIN – T1 BERTH 49 RAMP 5

Port Of Dublin 2nd visit – T1 Berth 49 Ramp 5, Irish Ferries – 600sqm.

Comments Off on PORT OF DUBLIN – T1 BERTH 49 RAMP 5

TOR HAFNIA, GERMANY

Over 300sqm, removed, blasted and replaced with TRAFFIDECK system provided by DOW Hyperlast whilst in dry dock at Cuxhafen.

Comments Off on TOR HAFNIA, GERMANY

MV PEREGRINE

MV Peregrine Ship Deck Resurfacing. 528sqm. Resin Bonded job completed in April 2015.

Comments Off on MV PEREGRINE

PORT OF DOVER

Berth 6 replacement project completed for the Port of Dover – 860sqm.

Comments Off on PORT OF DOVER

BIMAGRIP TRIALS, DUNKERQUE FRANCE

Several trials carried out for ACl at Dunkerque France.

Comments Off on BIMAGRIP TRIALS, DUNKERQUE FRANCE

RYDE PIER, ISLE OF WIGHT

Work completed for Coastal Preservation during 2010.

Comments Off on RYDE PIER, ISLE OF WIGHT